Online-Trading Portfolio-Tracker Research Back-Office MF-Tracker
BSE Prices delayed by 5 minutes... << Prices as on Jul 31, 2026 - 3:42PM >>   ABB 7285.95 [ -0.08 ]ACC 1357.6 [ -0.03 ]AMBUJA CEM 432 [ -0.53 ]ASIAN PAINTS 2748.5 [ 0.06 ]AXIS BANK 1228 [ -0.07 ]BAJAJ AUTO 11506 [ 0.62 ]BANKOFBARODA 242.6 [ 0.50 ]BHARTI AIRTE 1968.8 [ 0.67 ]BHEL 405 [ 0.53 ]BPCL 319.75 [ 1.19 ]BRITANIAINDS 5412.95 [ -1.97 ]CIPLA 1473 [ 0.48 ]COAL INDIA 414.1 [ -0.77 ]COLGATEPALMO 2075.8 [ -0.44 ]DABUR INDIA 421.5 [ -0.95 ]DLF 658.75 [ 0.56 ]DRREDDYSLAB 1150 [ 0.49 ]GAIL 181.4 [ 4.52 ]GRASIM INDS 3093.8 [ -0.33 ]HCLTECHNOLOG 1346.5 [ -0.50 ]HDFC BANK 747.9 [ -1.09 ]HEROMOTOCORP 5380 [ 1.03 ]HIND.UNILEV 2100.3 [ -0.37 ]HINDALCO 977.3 [ 0.67 ]ICICI BANK 1432.75 [ -0.26 ]INDIANHOTELS 740 [ -1.22 ]INDUSINDBANK 1009.5 [ -0.19 ]INFOSYS 1130 [ -2.26 ]ITC LTD 280.95 [ -1.51 ]JINDALSTLPOW 1102.65 [ 0.86 ]KOTAK BANK 388 [ -0.24 ]L&T 3937 [ -0.04 ]LUPIN 2418.3 [ -0.03 ]MAH&MAH 3396.25 [ 3.58 ]MARUTI SUZUK 14242 [ 0.37 ]MTNL 27.08 [ 0.33 ]NESTLE 1503.2 [ -1.14 ]NIIT 95.55 [ 0.74 ]NMDC 84.91 [ -0.09 ]NTPC 346 [ 0.44 ]ONGC 242.45 [ 0.35 ]PNB 112.7 [ 0.99 ]POWER GRID 284.35 [ -0.47 ]RIL 1307.3 [ 1.00 ]SBI 1026.8 [ 0.06 ]SESA GOA 264.25 [ -1.25 ]SHIPPINGCORP 291.45 [ 4.63 ]SUNPHRMINDS 1989.35 [ -0.57 ]TATA CHEM 673 [ 0.40 ]TATA GLOBAL 1083.4 [ -1.00 ]TATA MOTORS 340.4 [ 1.92 ]TATA STEEL 189.8 [ 1.52 ]TATAPOWERCOM 380.6 [ 1.22 ]TCS 2366 [ -2.71 ]TECH MAHINDR 1650 [ -1.13 ]ULTRATECHCEM 11852 [ 0.04 ]UNITED SPIRI 1516.85 [ -0.55 ]WIPRO 183.6 [ -1.48 ]ZEETELEFILMS 114.35 [ 1.87 ] BSE NSE
You can view the entire text of Notes to accounts of the company for the latest year

ISIN: INE0PMR01017INDUSTRY: Services - Others

NSE   ` 355.00   Open: 354.00   Today's Range 343.00
362.00
+10.00 (+ 2.82 %) Prev Close: 345.00 52 Week Range 106.50
368.00
Year End :2025-03 

xii. Contingent liabilities and provisions

A contingent liability is a possible obligation that arises from past events whose existence will be confirmed
by the occurrence or non-occurrence of one or more uncertain future events beyond the control of the
Company or a present obligation that is not recognised because it is not probable that an outflow of
resources will be required to settle the obligation. A contingent liability also arises in extremely rare cases
where there is a liability that cannot be recognised because it cannot be measured reliably.

A disclosure is made for a contingent liability when there is a:

a) possible obligation, the existence of which will be confirmed by the occurrence/non-occurrence of one or
more uncertain events, not fully with in the control of the Company;

b) present obligation, where it is not probable that an outflow of resources embodying economic benefits will
be required to settle the obligation;

c) present obligation, where a reliable estimate cannot be made.

A provision is recognised when the Company has a present obligation as a result of past events, it is
probable that an outflow of resources embodying economic benefits will be required to settle the obligation
and a reliable estimate can be made of the amount of the obligation. Provisions are not disclosed to their
present value and are determined based on best estimates required to settle the obligation at the reporting
date. These estimates are reviewed at each reporting date and are adjusted to reflect the current best
estimates.