Online-Trading Portfolio-Tracker Research Back-Office MF-Tracker
BSE Prices delayed by 5 minutes... << Prices as on Apr 16, 2026 - 3:59PM >>   ABB 6887.6 [ 0.30 ]ACC 1444 [ 1.02 ]AMBUJA CEM 458.65 [ 1.04 ]ASIAN PAINTS 2437.9 [ 0.62 ]AXIS BANK 1349.5 [ -0.41 ]BAJAJ AUTO 9843.75 [ -0.17 ]BANKOFBARODA 279.1 [ 0.22 ]BHARTI AIRTE 1840.35 [ -0.82 ]BHEL 309.05 [ 5.68 ]BPCL 308 [ -0.73 ]BRITANIAINDS 5589.5 [ -1.15 ]CIPLA 1230.75 [ 0.33 ]COAL INDIA 432.9 [ -0.64 ]COLGATEPALMO 1972.4 [ 1.48 ]DABUR INDIA 427.5 [ -1.35 ]DLF 589.7 [ 0.34 ]DRREDDYSLAB 1221.25 [ 0.24 ]GAIL 158.9 [ 1.76 ]GRASIM INDS 2722.1 [ -0.59 ]HCLTECHNOLOG 1450.7 [ -0.04 ]HDFC BANK 795.5 [ -1.75 ]HEROMOTOCORP 5160.85 [ -2.35 ]HIND.UNILEV 2141.8 [ -0.68 ]HINDALCO 1039.65 [ 2.76 ]ICICI BANK 1345.45 [ -0.17 ]INDIANHOTELS 654.85 [ 1.31 ]INDUSINDBANK 846 [ 0.73 ]INFOSYS 1318.9 [ 1.05 ]ITC LTD 303.45 [ 0.45 ]JINDALSTLPOW 1223.85 [ 0.20 ]KOTAK BANK 379.4 [ -0.75 ]L&T 4117.35 [ 1.02 ]LUPIN 2322.7 [ -0.71 ]MAH&MAH 3223.85 [ -0.99 ]MARUTI SUZUK 13333.95 [ 0.37 ]MTNL 33.27 [ 1.12 ]NESTLE 1258.55 [ 0.18 ]NIIT 70.51 [ 3.39 ]NMDC 87.18 [ -0.08 ]NTPC 390.8 [ -0.47 ]ONGC 282.75 [ -1.67 ]PNB 113.5 [ 0.40 ]POWER GRID 312.25 [ -0.13 ]RIL 1343.45 [ -0.06 ]SBI 1067.5 [ -0.36 ]SESA GOA 782.75 [ 2.20 ]SHIPPINGCORP 289.2 [ 14.20 ]SUNPHRMINDS 1693.15 [ -0.21 ]TATA CHEM 709.2 [ -1.49 ]TATA GLOBAL 1103 [ 0.83 ]TATA MOTORS 356.45 [ -0.41 ]TATA STEEL 210.7 [ 0.91 ]TATAPOWERCOM 427.25 [ 1.29 ]TCS 2577.1 [ 0.89 ]TECH MAHINDR 1490.9 [ 0.49 ]ULTRATECHCEM 11828.2 [ 0.50 ]UNITED SPIRI 1258.5 [ 0.52 ]WIPRO 210.2 [ 0.19 ]ZEETELEFILMS 80.21 [ -3.05 ] BSE NSE
You can view the entire text of Notes to accounts of the company for the latest year

ISIN: INE0PMR01017INDUSTRY: Services - Others

NSE   ` 212.70   Open: 208.90   Today's Range 208.90
212.70
+10.10 (+ 4.75 %) Prev Close: 202.60 52 Week Range 62.00
299.30
Year End :2025-03 

xii. Contingent liabilities and provisions

A contingent liability is a possible obligation that arises from past events whose existence will be confirmed
by the occurrence or non-occurrence of one or more uncertain future events beyond the control of the
Company or a present obligation that is not recognised because it is not probable that an outflow of
resources will be required to settle the obligation. A contingent liability also arises in extremely rare cases
where there is a liability that cannot be recognised because it cannot be measured reliably.

A disclosure is made for a contingent liability when there is a:

a) possible obligation, the existence of which will be confirmed by the occurrence/non-occurrence of one or
more uncertain events, not fully with in the control of the Company;

b) present obligation, where it is not probable that an outflow of resources embodying economic benefits will
be required to settle the obligation;

c) present obligation, where a reliable estimate cannot be made.

A provision is recognised when the Company has a present obligation as a result of past events, it is
probable that an outflow of resources embodying economic benefits will be required to settle the obligation
and a reliable estimate can be made of the amount of the obligation. Provisions are not disclosed to their
present value and are determined based on best estimates required to settle the obligation at the reporting
date. These estimates are reviewed at each reporting date and are adjusted to reflect the current best
estimates.